FEATURED PROJECT
Dignity Health Chandler Regional Medical Center
- Chandler, AZ
Dignity Health Chandler Regional Medical Center opened a new 96-bed tower today. The 171,000-square-foot expansion will bring the hospital’s bed count to 339, and allow for adding and growing comprehensive services. The Berg Group is proud to have been a part of this beautiful and impactful project to serve the the Arizona community.
- Interior Framing
- Drywall
- EIFS
- Painting
- Prefabrication

RECENT PROJECTS
EV Battery Manufacturing Facility
- Location: Midwest
- Project Value: $185 Million
- Project Size: 44,000 sq ft
- Start Date: March 2023
- Completion Date: August 2024
-
Scope:
Walkable Lids - ACT - Doors Your text here and here and here and here - Project Highlights:
- Six-phase cleanroom project
- Installed 2,800+ linear feet of walls ranging from 10’ to 30’ in height
Electric Vehicle Center
- Location: Austin, TX
- Project Value: $1.2 Billion
- Project Size: 10 Million sq ft
- Start Date: June 2021
- Completion Date: February 2023
-
Scope:
Framing - Drywall - Acoustical - Insulation - Demountable Systems - IMP - Project Highlights:
- Installed 22,000+ linear feel of walls ranging from 20’ to 58’ in height
- Your text here
Lithium-Ion Battery Facility
- Location: Midwest
- Project Value: $1.7 Billion
- Project Size: 1.2 Million sq ft
- Start Date: March 2023
- Completion Date: December 2024
-
Scope:
Framing - Drywall - Acoustical - Insulation - Project Highlights:
- Installed 24,000+ linear feet of walls ranging from 20’ to 60’ in height
Semiconductor Manufacturing Campus
- Location: Austin, TX
- Project Value: $167 Billion
- Project Size: 1.6 Million sq ft
- Start Date: July 2023
- Completion Date: December 2024
-
Scope:
Framing - Drywall - Acoustical - Insulation - Project Highlights:
- Installed 50,000+ linear feet of walls ranging from 20’ to 70’ in height
- Two levels of cleanrooms
Cathode Manufacturing Facility
- Location: Tennessee
- Project Value: $3.2 Billion
- Project Size: 1.2 Million sq ft
- Start Date: September 2024
- Completion Date: December 2025
- Project Highlights:
- All rated and non-rated IMP wall assemblies in the CR/DR scope, including door assemblies in non-rated systems, along with the supply and installation of all air showers for the project.
Lithium-Ion Battery Plant
- Location: Ohio
- Project Value: $1.6 Billion
- Project Size: 2 Million sq ft
- Start Date: January 2024
- Completion Date: December 2025
- Project Highlights:
- The scope includes all rated and non-rated IMP wall assemblies in the CR/DR areas, all door assemblies in non-rated systems, and the supply and installation of all air showers in the project.

Prefabrication
Banner Boswell Medical Center
- 6 Stories
- 40,000 Square Feet
- 56 Beds
- McCarthy Construction
- Drywall, Painting, Prefabrication, Interior Framing, Exterior Metal Panels, Insulation, Fireproofing, Column Covers
- Sun City, AZ
Interior and Exterior

Sacramento Convention Center
- 111,000 Square Feet
- Aecom
- Drywall, Painting, Plaster, Exterior Framing, Interior Framing
- Sacramento, CA

Interior and Exterior
JET LINX HANGAR
- 18,000 Square Feet
- Mid-Minnesota Builders
- Paint, Plastering, Steel Framing, Drywall, Decorative Wood Panels
- Eden Prairie, MN

Interior and Exterior
EXPO
- 25 Stories
- 368 Units
- Doran Construction
- Exterior Framing, Interior Framing, Drywall, Hanging and Taping
- Minneapolis, MN

Interior and Exterior
Nobel Hall
- 90,935 Square Feet
- Kraus-Anderson Construction
- Exterior Framing, Interior Framing, Exterior Densglass Sheathing, Hanging, Taping, Spray Applied Fireproofing
- St. Peter, MN

Interior and Exterior
MANGINI RANCH ELEMENTARY SCHOOL
- 65,000 Square Feet
- Kitchell Construction
- Drywall, Paining, Interior Framing, Exterior Framing, Sheathing, EIFS
- Folsom, CA
project Gallery
G1 Hangar
Mirabella-at-ASU-new
High Desert Mental Health
The Hartford
Musical Instrument Museum